Here is the progression of the addition from the driveway view. There isn't much difference in the overall look from the street, just that the garage is now connected to the main house instead of detached and is slightly elevated.
| Packed up the garage in a storage pod, and sent it off-site. |
| Alright, here we go! |
| Woah! That was fast :) |
Now here is the progression from our back porch. One of the changes we made mid project was the expansion of our original 10'x10' covered porch to a 10'x20' covered porch. Our original porch had a drop ceiling (7' high), and they were able to raise that to a normal 8' height, add ceiling fans and recessed lighting - yay!! Well worth the extra cost in my book :)
| Keira stayed home from school to watch the demolition from our back hall - it's was amazing! Garage was completely down in about 2 hours! |
| A little while longer to load it up... |
![]() |
| And it was completely gone in about half a day. |
![]() |
![]() |
| From this view you can see how small our back porch was prior to the addition. |
![]() |
| View from the back fence |
The framing and exterior work happened very quickly and it was very exciting to see the daily changes. Once we got to finish out, the project seemed to go much slower, and actually completely stalled for about 3 weeks while we were waiting for interior doors to come in. But, this is what we ended up with:
| Standing where the back door used to be, looking at our new mud room, then the office behind the barn door. |
| My barn door! Still need the trim above it to hide the metal rail, as well as hardware, but I love it! |
| Office with my ocean blue green accent wall :) |
| Our giant desk will run across back wall, then under all windows on the right. |
| Guest room with the large storage closet in the back corner. |
| Guest room view from the storage closet. |
![]() |
| And our beautiful garage! |
During this construction project, we also had several projects in the main house, including a brand new AC unit (moved from a hallway closet to the attic), spray foam insulation in the attic, and installation of a whole house in-wall vacuum system. Yay! However, these projects are where the majority of our headaches came from....
Over Labor Day weekend, we woke up at 3am to the sound of dripping water. Jim flipped on the lights, and found a water bubble in the ceiling just to the right of our bed, with water lines at all the sheet rock seams. We went up to the attic and found they had hooked up our brand new AC incorrectly and the condensation line was essentially draining into the ceiling instead of outside! Ugh, and our master bedroom was the one room in the house that didn't really need any work! We then had to move everything out of the bedroom so they could replace sheet rock and re-paint the entire ceiling.
Then, a couple weeks later as we were having the foam insulation sprayed in the attic, the guy tripped and fell through the ceiling in the kitchen. Are you kidding me?!? Ugh, so another project for the sheet rock guys...
Anyway, happy to finally have it done!